What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 6 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £17.77 |
| 2 | Fasnakyle G3 | £10.87 |
| 3 | Lakeside | £9.59 |
| 4 | F & S Energy #02 | £9.28 |
| 5 | Bloxwich | £9.00 |
| 6 | F & S Energy #01 | £8.79 |
| 7 | Carrington Ltd - 2 | £7.75 |
| Region | £/MWh |
|---|---|
| Yorkshire | £9.6 |
| Midlands | £9.0 |
| South Wales | £6.7 |
| South Western | £5.8 |