What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 55 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | SOUTH HUMBER BANK P/S | £164.00 |
| 2 | Lakeside | £132.70 |
| 3 | Oldham | £96.05 |
| 4 | Port of Tyne | £94.88 |
| 5 | Bloxwich | £92.41 |
| 6 | Hunningley Stairfoot | £91.92 |
| 7 | SSE Energy Supply #01 | £88.71 |
| Region | £/MWh |
|---|---|
| Yorkshire | £118.6 |
| North Western | £96.0 |
| Northern | £94.9 |
| Midlands | £92.4 |
| Eastern | £74.6 |
| South Wales | £69.0 |
| South Eastern | £44.5 |
| Southern | £44.1 |
| South Western | £39.1 |