What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Great Yarmouth | £28.58 |
| 2 | Didcot B main 5 | £27.61 |
| 3 | Keadby-2 Main | £26.00 |
| 4 | Unit 3 | £24.19 |
| 5 | KGL 1 | £24.00 |
| 6 | Seabank Module 2 | £23.75 |
| 7 | Dong Severn Ut 10 | £23.68 |
| Region | £/MWh |
|---|---|
| Yorkshire | £12.1 |
| South Eastern | £11.2 |
| North Western | £10.2 |
| Eastern | £8.7 |
| Southern | £8.6 |