What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
| Region | £/MWh |
|---|---|
| Yorkshire | £2.8 |
| Midlands | £2.2 |
| South Eastern | £2.2 |
| Eastern | £1.9 |
| South Wales | £1.7 |
| Southern | £1.6 |