What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Sizing John | £3.36 |
| 2 | Immingham CHP | £3.17 |
| 3 | Keadby-2 Main | £2.96 |
| 4 | Shoreham | £2.54 |
| 5 | Dollymans | £2.17 |
| 6 | Swangate | £2.01 |
| 7 | Statkraft Markets #16 | £2.00 |
| Region | £/MWh |
|---|---|
| Eastern | £2.1 |
| Yorkshire | £2.0 |
| North Western | £1.7 |
| South Eastern | £1.7 |
| Midlands | £1.5 |
| Southern | £1.4 |
| Northern | £1.3 |