What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Sizing John | £12.50 |
| 2 | Immingham CHP | £10.94 |
| 3 | Keadby-2 Main | £9.59 |
| 4 | Coryton | £9.42 |
| 5 | Shoreham | £9.01 |
| 6 | Dollymans | £7.50 |
| 7 | Swangate | £7.06 |
| Region | £/MWh |
|---|---|
| Eastern | £9.2 |
| Yorkshire | £7.1 |
| North Western | £5.4 |
| South Eastern | £4.7 |
| Northern | £4.5 |
| Southern | £4.2 |
| South Western | £2.8 |