What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | BESS Holdco 2 N02A | £6.46 |
| 2 | EDF Energy F01C | £5.33 |
| 3 | Ilmer Lane | £4.75 |
| 4 | Tebworth Park | £4.64 |
| 5 | Broadditch | £4.36 |
| 6 | Rock Farm | £4.33 |
| 7 | BREDBURY | £4.25 |
| Region | £/MWh |
|---|---|
| Eastern | £4.4 |
| Midlands | £4.3 |
| North Western | £4.3 |
| Yorkshire | £4.2 |
| South Eastern | £4.1 |
| East Midlands | £4.1 |
| Southern | £4.0 |
| South Western | £3.9 |