What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 10 | £2.27 |
| 2 | Tebworth Park | £1.95 |
| 3 | BMUid for Sutton Bridge | £1.76 |
| 4 | F & S Energy #03 | £1.75 |
| 5 | SOUTH HUMBER BANK P/S | £1.55 |
| 6 | Unit 3 | £1.33 |
| 7 | THURROCK STORAGE #3 | £1.11 |
| Region | £/MWh |
|---|---|
| Eastern | £1.9 |
| South Eastern | £1.1 |