What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 10 | £6.33 |
| 2 | Tebworth Park | £6.16 |
| 3 | BMUid for Sutton Bridge | £6.01 |
| 4 | SOUTH HUMBER BANK P/S | £5.87 |
| 5 | Unit 3 | £5.72 |
| 6 | Centrica Business Solutions S05L | £5.43 |
| Region | £/MWh |
|---|---|
| Eastern | £6.2 |