What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 31 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | THURROCK STORAGE #3 | £6.32 |
| 2 | Tebworth Park | £4.63 |
| 3 | Marchwood | £4.57 |
| 4 | F & S Energy #03 | £4.56 |
| Region | £/MWh |
|---|---|
| South Eastern | £6.3 |
| Eastern | £4.6 |