What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 3 | £29.31 |
| 2 | Didcot B main 5 | £29.00 |
| 3 | Keadby-2 Main | £27.00 |
| 4 | Dong Severn Ut 10 | £24.24 |
| 5 | Seabank Module 2 | £24.13 |
| 6 | Carrington Ltd - 2 | £22.52 |
| 7 | Langage | £20.17 |
| Region | £/MWh |
|---|---|
| South Eastern | £19.2 |
| Eastern | £18.3 |
| Southern | £18.2 |
| Yorkshire | £16.3 |
| South Wales | £12.9 |
| North Western | £11.7 |