What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £19.21 |
| 2 | Tebworth Park | £17.13 |
| 3 | Drax | £15.56 |
| 4 | Pillswood 2 | £15.09 |
| 5 | Lakeside | £14.08 |
| 6 | Monk Fryston | £14.08 |
| 7 | Statkraft Markets #4 | £14.00 |
| Region | £/MWh |
|---|---|
| Eastern | £17.1 |
| Yorkshire | £14.1 |
| Merseyside and North Wales | £11.3 |
| South Eastern | £10.7 |
| Southern | £9.9 |
| North Western | £9.7 |
| Northern | £9.5 |