What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £13.07 |
| 2 | Marchwood | £9.82 |
| 3 | Lakeside | £9.17 |
| 4 | SOUTH HUMBER BANK P/S | £9.09 |
| 5 | Pillswood 1 | £8.48 |
| 6 | Skelmersdale | £8.22 |
| 7 | Coryton | £8.13 |
| Region | £/MWh |
|---|---|
| Yorkshire | £8.7 |
| North Western | £8.2 |
| South Eastern | £8.1 |
| Eastern | £7.0 |
| Southern | £6.6 |
| South Wales | £5.7 |