What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Flexitricity #08 | £7.40 |
| 2 | EDFE Aggregate S Eng 02 | £5.75 |
| 3 | Broadditch | £5.71 |
| 4 | BREDBURY | £5.66 |
| 5 | Drax | £5.61 |
| 6 | Tye Lane | £5.53 |
| 7 | Lakeside | £5.05 |
| Region | £/MWh |
|---|---|
| North Western | £5.7 |
| Yorkshire | £5.0 |
| South Eastern | £4.6 |
| Southern | £4.5 |
| Eastern | £4.5 |
| South Wales | £4.4 |
| Midlands | £4.2 |
| South Western | £4.1 |