What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | THURROCK STORAGE #3 | £28.61 |
| 2 | Skelmersdale | £19.13 |
| 3 | Lakeside | £18.60 |
| 4 | Chapel Farm | £18.51 |
| 5 | UKPR East Mids | £18.25 |
| 6 | UKPR MANW | £18.20 |
| 7 | UKPR S East | £18.20 |
| Region | £/MWh |
|---|---|
| South Eastern | £25.6 |
| North Western | £19.1 |
| Yorkshire | £18.6 |
| Northern | £17.7 |
| Eastern | £17.7 |
| Southern | £17.6 |
| Midlands | £17.1 |