What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 18 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | THURROCK STORAGE #3 | £17.52 |
| 2 | UKPR East Mids | £13.71 |
| 3 | UKPR MANW | £13.14 |
| 4 | UKPR S East | £12.65 |
| 5 | Gerrards Cross | £12.32 |
| 6 | BREDBURY | £11.94 |
| 7 | SUNDON | £11.52 |
| Region | £/MWh |
|---|---|
| South Eastern | £12.2 |
| Southern | £11.7 |
| North Western | £11.2 |
| South Western | £10.7 |
| Northern | £10.5 |
| Eastern | £10.1 |
| Midlands | £9.3 |
| Yorkshire | £9.3 |