What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £39.00 |
| 2 | Dong Severn Ut 10 | £38.03 |
| 3 | Exergy Solutions E00E | £35.53 |
| 4 | Gerrards Cross | £34.13 |
| 5 | THURROCK STORAGE #2 | £33.11 |
| 6 | Broadditch | £32.14 |
| 7 | Damhead Creek | £31.90 |
| Region | £/MWh |
|---|---|
| South Eastern | £31.4 |
| North Western | £30.2 |
| Northern | £28.7 |
| Southern | £28.3 |
| Eastern | £27.0 |
| South Wales | £26.4 |
| Midlands | £26.1 |
| Yorkshire | £25.0 |
| South Western | £24.7 |