What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 47 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 10 | £9.22 |
| 2 | Exergy Solutions E00E | £5.25 |
| 3 | Swangate | £4.43 |
| 4 | Carnegie Road 1 | £4.20 |
| 5 | Wormald Green | £4.14 |
| 6 | Port of Tyne | £3.57 |
| 7 | Lakeside | £3.49 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £4.2 |
| Yorkshire | £3.7 |
| Eastern | £3.3 |
| Northern | £3.2 |
| Southern | £2.7 |