What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 61 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £19.52 |
| 2 | Didcot B main 5 | £18.50 |
| 3 | F & S Energy #02 | £15.32 |
| 4 | Unit 3 | £14.90 |
| 5 | Seabank Module 2 | £14.87 |
| 6 | Tebworth Park | £14.19 |
| 7 | Kings Lynn A | £13.50 |
| Region | £/MWh |
|---|---|
| Eastern | £9.7 |
| North Western | £9.2 |
| Yorkshire | £8.5 |
| Northern | £8.2 |
| South Western | £7.0 |
| South Eastern | £6.4 |
| Southern | £5.6 |
| Midlands | £5.4 |