What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £186.00 |
| 2 | Ilmer Lane | £105.76 |
| 3 | Broadditch | £18.52 |
| 4 | Carrington Ltd - 2 | £18.38 |
| 5 | Swangate | £9.38 |
| 6 | Buxton | £9.38 |
| Region | £/MWh |
|---|---|
| Eastern | £55.6 |
| South Eastern | £18.5 |
| Yorkshire | £9.4 |
| North Western | £5.9 |
| Southern | £0.0 |