What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £4.00 |
| 2 | Shoreham | £3.96 |
| 3 | Unit 3 | £3.61 |
| 4 | Broadditch | £2.73 |
| 5 | Exergy Solutions E00E | £2.50 |
| 6 | Lakeside | £2.40 |
| 7 | West Burton B 2 | £2.40 |
| Region | £/MWh |
|---|---|
| South Eastern | £2.3 |
| South Wales | £2.0 |
| Southern | £1.8 |
| South Scotland | £1.7 |
| Yorkshire | £1.6 |
| Eastern | £1.4 |
| North Western | £1.3 |
| Northern | £1.2 |
| South Western | £0.4 |