What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 13 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Enfield Centre Ltd BMU1 | £26.10 |
| 2 | Seabank Module | £25.52 |
| 3 | Dong Severn Ut 10 | £22.61 |
| 4 | Carrington Ltd - 2 | £19.67 |
| 5 | Tye Lane | £16.82 |
| 6 | Redditch | £16.74 |
| 7 | Peterborough 3 | £16.74 |
| Region | £/MWh |
|---|---|
| Eastern | £14.3 |
| Southern | £10.6 |
| South Eastern | £6.0 |
| East Midlands | £5.6 |
| South Western | £5.6 |
| South Wales | £5.5 |
| Yorkshire | £5.0 |
| North Western | £5.0 |