What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 44 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Brigg | £21.51 |
| 2 | SSE Energy Supply #01 | £18.63 |
| 3 | Bloxwich | £9.74 |
| 4 | Sizing John | £9.45 |
| 5 | UKPR East Mids | £8.85 |
| 6 | UKPR S East | £8.85 |
| 7 | Native River | £8.64 |
| Region | £/MWh |
|---|---|
| Yorkshire | £17.3 |
| South Western | £8.6 |
| Merseyside and North Wales | £8.5 |
| Midlands | £8.5 |
| South Wales | £8.4 |
| North Western | £8.3 |
| Southern | £7.6 |
| Eastern | £7.2 |
| South Eastern | £7.0 |
| Northern | £3.2 |
| East Midlands | £3.1 |