What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £19.23 |
| 2 | Centrica Business Solutions S05L | £17.65 |
| 3 | BESS Holdco 2 N02A | £17.59 |
| 4 | ClayTye Farm 2 | £17.50 |
| 5 | SSE Energy Supply #01 | £13.15 |
| 6 | Thame Road | £12.58 |
| 7 | SOUTH HUMBER BANK P/S | £12.56 |
| Region | £/MWh |
|---|---|
| South Wales | £11.5 |
| Eastern | £10.8 |
| Yorkshire | £9.4 |
| Northern | £8.5 |
| South Eastern | £7.9 |
| Merseyside and North Wales | £5.6 |
| Southern | £3.3 |