What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Sizing John | £51.60 |
| 2 | Native River | £51.50 |
| 3 | Carnegie Road 1 | £49.67 |
| 4 | SSE Energy Supply #01 | £48.90 |
| 5 | Tye Lane | £48.08 |
| 6 | EDF Energy F01C | £48.00 |
| 7 | Pivot Kemsley | £47.67 |
| Region | £/MWh |
|---|---|
| South Western | £51.5 |
| Merseyside and North Wales | £49.7 |
| Southern | £46.2 |
| South Wales | £42.5 |
| Midlands | £42.5 |
| Eastern | £42.3 |
| Northern | £42.1 |
| Yorkshire | £38.1 |
| East Midlands | £38.0 |
| North Western | £37.4 |
| South Eastern | £37.4 |