What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £54.40 |
| 2 | Unit 2 | £51.34 |
| 3 | Blackpool | £51.08 |
| 4 | Jamesfield 1 | £41.70 |
| 5 | Lakeside | £40.05 |
| 6 | Little Raith | £37.88 |
| 7 | Roaring Hill | £37.88 |
| Region | £/MWh |
|---|---|
| Yorkshire | £40.0 |
| South Scotland | £37.9 |
| North Western | £36.5 |
| North Scotland | £34.0 |
| Eastern | £33.0 |
| Southern | £31.2 |
| Northern | £28.3 |
| South Eastern | £27.5 |