What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 1 | £17.70 |
| 2 | Unit 2 | £14.52 |
| 3 | SOUTH HUMBER BANK P/S | £13.51 |
| 4 | Port of Tyne | £13.43 |
| 5 | F & S Energy #01 | £11.00 |
| 6 | Brigg | £10.98 |
| 7 | Statkraft Markets #01 | £10.89 |
| Region | £/MWh |
|---|---|
| Northern | £13.4 |
| Yorkshire | £10.8 |
| South Wales | £10.3 |
| Southern | £9.6 |
| North Western | £9.2 |
| Eastern | £7.8 |
| Midlands | £5.1 |