What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 3 | £19.81 |
| 2 | GridBeyond L0DN | £18.90 |
| 3 | Carrington Ltd - 2 | £15.45 |
| 4 | Skelmersdale | £15.29 |
| 5 | Chapel Farm | £14.54 |
| 6 | Thame Road | £14.54 |
| 7 | SUNDON | £14.15 |
| Region | £/MWh |
|---|---|
| North Western | £15.3 |
| South Eastern | £13.8 |
| Eastern | £13.3 |
| Southern | £13.2 |
| Merseyside and North Wales | £10.4 |
| Yorkshire | £9.5 |
| Northern | £9.5 |
| South Scotland | £9.3 |
| South Western | £8.7 |
| South Wales | £7.9 |