What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £42.78 |
| 2 | Didcot B main 5 | £37.82 |
| 3 | Seabank Module | £29.01 |
| 4 | BREDBURY | £25.94 |
| 5 | West Burton B 2 | £23.50 |
| 6 | Brigg | £23.27 |
| 7 | SOUTH HUMBER BANK P/S | £21.57 |
| Region | £/MWh |
|---|---|
| North Western | £25.9 |
| Southern | £20.7 |
| South Western | £17.6 |
| Yorkshire | £17.2 |
| Eastern | £12.2 |
| Merseyside and North Wales | £12.0 |
| East Midlands | £7.3 |
| South Eastern | £7.0 |