What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 38 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Great Yarmouth | £18.00 |
| 2 | Ilmer Lane | £17.98 |
| 3 | Marchwood | £17.52 |
| 4 | Carrington Ltd - 2 | £15.60 |
| 5 | Grain | £12.31 |
| 6 | Shoreham | £12.08 |
| 7 | Damhead Creek | £12.06 |
| Region | £/MWh |
|---|---|
| South Western | £10.0 |
| South Eastern | £10.0 |
| Eastern | £9.7 |
| Yorkshire | £8.9 |
| South Wales | £8.8 |
| Southern | £8.3 |
| Midlands | £7.9 |