What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 21 | £18.19 |
| 2 | Lakeside | £14.97 |
| 3 | Native River | £14.96 |
| 4 | Bloxwich | £14.70 |
| 5 | F & S Energy #02 | £14.60 |
| 6 | Holes Bay | £14.12 |
| 7 | Shoreham | £14.00 |
| Region | £/MWh |
|---|---|
| South Western | £15.0 |
| Midlands | £14.7 |
| Southern | £14.1 |
| Yorkshire | £14.0 |
| Eastern | £10.4 |
| South Eastern | £6.7 |