What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 31 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 21 | £24.25 |
| 2 | Carrington Ltd - 2 | £21.57 |
| 3 | Cottam Development Centre | £20.23 |
| 4 | Grain | £19.92 |
| 5 | Pillswood 1 | £17.32 |
| 6 | Bloxwich | £16.83 |
| 7 | Port of Tyne | £16.79 |
| Region | £/MWh |
|---|---|
| Yorkshire | £17.3 |
| Eastern | £15.8 |
| Merseyside and North Wales | £15.4 |
| Midlands | £14.7 |
| South Eastern | £14.4 |
| Northern | £14.0 |
| South Western | £14.0 |
| Southern | £14.0 |