What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 3 | £17.45 |
| 2 | Nursling | £16.75 |
| 3 | Unit 1 | £16.25 |
| 4 | Lakeside | £15.88 |
| 5 | Damhead Creek | £15.50 |
| 6 | Hunningley Stairfoot | £14.36 |
| 7 | Limejump Energy #04 | £13.52 |