What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 13 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 11 | £25.89 |
| 2 | Wormald Green | £18.81 |
| 3 | Keadby-2 Main | £17.85 |
| 4 | Statkraft Markets #01 | £17.09 |
| 5 | KGL 1 | £15.73 |
| 6 | Unit 3 | £14.80 |
| 7 | SSE Energy Supply #01 | £13.86 |
| Region | £/MWh |
|---|---|
| Northern | £18.8 |
| Southern | £12.9 |
| South Wales | £11.7 |
| North Western | £11.7 |
| South Eastern | £10.9 |
| Eastern | £10.6 |
| Midlands | £9.6 |
| South Western | £8.5 |