What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 48 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Aggregate Midlands 2 | £21.89 |
| 2 | EDF Aggregate South England 3 | £20.02 |
| 3 | Keadby-2 Main | £18.66 |
| 4 | Dong Severn Ut 20 | £16.90 |
| 5 | BESS Holdco 2 EN7H | £16.52 |
| 6 | UKPR S East | £15.86 |
| 7 | THURROCK STORAGE #1 | £15.44 |
| Region | £/MWh |
|---|---|
| Southern | £14.0 |
| South Wales | £13.8 |
| South Eastern | £8.2 |
| Eastern | £8.0 |
| Midlands | £7.0 |
| East Midlands | £6.6 |
| South Western | £4.3 |