What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 57 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0DN | £83.49 |
| 2 | GridBeyond L0EN | £83.49 |
| 3 | Ferrybridge-1 | £52.50 |
| 4 | EDFE Aggregate NW Eng 3 | £51.57 |
| 5 | EDFE Aggregate S E Eng 02 | £50.21 |
| 6 | EDFE Aggregate S E Eng 03 | £50.21 |
| 7 | Danske Commodities A/S K01G | £50.08 |