What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Winchester | £34.29 |
| 2 | Torquay | £34.27 |
| 3 | Immingham | £31.52 |
| 4 | EDF Energy F01C | £27.79 |
| 5 | THURROCK STORAGE #3 | £26.99 |
| 6 | THURROCK STORAGE #1 | £25.06 |
| 7 | Dollymans | £24.74 |
| Region | £/MWh |
|---|---|
| Yorkshire | £31.4 |
| South Eastern | £25.6 |
| Eastern | £24.7 |
| Midlands | £20.1 |
| South Western | £19.7 |