What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 72 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | THURROCK STORAGE #2 | £13.79 |
| 2 | SSE Energy Supply #01 | £13.44 |
| 3 | UKPR S East | £12.88 |
| 4 | Limejump Energy #02 | £12.00 |
| 5 | Limejump Energy #04 | £11.75 |
| 6 | Hutton | £10.55 |
| 7 | Ilmer Lane | £7.90 |
| Region | £/MWh |
|---|---|
| South Eastern | £12.6 |
| Eastern | £8.6 |
| Southern | £7.2 |
| South Wales | £7.1 |
| Midlands | £7.1 |