What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Energy F01C | £19.63 |
| 2 | Brook Farm | £16.36 |
| 3 | Berkeley | £16.32 |
| 4 | EDF Energy #1 | £15.00 |
| 5 | Rock Farm | £13.86 |
| 6 | SUNDON | £13.52 |
| 7 | EDF Aggregated Unit 05 | £12.68 |
| Region | £/MWh |
|---|---|
| Eastern | £16.4 |
| Midlands | £16.0 |
| Southern | £15.0 |
| South Eastern | £12.0 |
| East Midlands | £10.4 |