What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £29.06 |
| 2 | ECOTRICITY C05L | £11.23 |
| 3 | Capenhurst | £10.87 |
| 4 | Whitebirk | £7.21 |
| 5 | UKPR East Mids | £6.29 |
| 6 | UK Power Reserve #08 | £6.29 |
| 7 | Flexitricity #01 | £5.93 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £10.6 |
| North Western | £7.2 |
| South Wales | £5.0 |
| South Eastern | £4.8 |
| Eastern | £4.5 |
| Southern | £4.5 |
| South Western | £3.5 |