What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 43 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £57.15 |
| 2 | Clachan G1 | £43.10 |
| 3 | GridBeyond L0DN | £34.71 |
| 4 | Centrica Business Solutions S05L | £28.43 |
| 5 | Hunningley Stairfoot | £27.00 |
| 6 | Bulphan Fen | £25.50 |