What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £201.28 |
| 2 | GridBeyond L0DN | £169.17 |
| 3 | Flexitricity #09 | £164.78 |
| 4 | Dong Severn Ut 10 | £140.43 |
| 5 | Dong Severn Ut 20 | £139.46 |
| 6 | Spalding | £131.42 |
| 7 | SSE Energy Supply #01 | £122.40 |
| Region | £/MWh |
|---|---|
| East Midlands | £116.9 |
| Eastern | £116.7 |
| North Scotland | £114.2 |
| South Scotland | £113.9 |
| Yorkshire | £112.3 |