What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #03 | £13.75 |
| 2 | Immingham | £13.42 |
| 3 | THURROCK STORAGE #2 | £12.88 |
| 4 | Dinorwig | £12.53 |
| 5 | Ocker Hill | £12.47 |
| 6 | Monk Fryston | £12.47 |
| 7 | Lakeside | £12.46 |
| Region | £/MWh |
|---|---|
| Yorkshire | £12.6 |
| Midlands | £12.5 |
| Eastern | £12.5 |
| East Midlands | £12.5 |
| South Eastern | £12.4 |
| South Western | £11.7 |