What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Farnham | £2.88 |
| 2 | UK Power Reserve #08 | £2.20 |
| 3 | Centrica Business Solutions S05L | £2.18 |
| 4 | UKPR S East | £1.86 |
| 5 | Ocker Hill | £1.17 |
| 6 | Lakeside | £1.14 |
| 7 | Richborough Park 1 | £0.92 |
| Region | £/MWh |
|---|---|
| Southern | £2.9 |
| Midlands | £1.2 |
| Yorkshire | £1.1 |
| South Eastern | £0.9 |
| South Wales | £0.3 |