What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 85 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £198.50 |
| 2 | GridBeyond L0DN | £153.25 |
| 3 | GridBeyond L0EN | £153.25 |
| 4 | Staythorpe 2 | £153.24 |
| 5 | Holes Bay | £99.13 |
| 6 | Blackpool | £96.67 |
| 7 | Whitebirk | £78.09 |
| Region | £/MWh |
|---|---|
| Southern | £78.6 |
| North Western | £78.1 |
| Northern | £72.7 |
| South Western | £68.7 |
| Eastern | £67.3 |