What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 18 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £55.29 |
| 2 | Fasnakyle G1 | £35.97 |
| 3 | Carrington Ltd - 2 | £26.29 |
| 4 | Enfield Centre Ltd BMU1 | £17.85 |
| 5 | GridBeyond L0DN | £16.65 |
| 6 | Kilmarnock South | £13.89 |
| 7 | Newton wood | £13.53 |
| Region | £/MWh |
|---|---|
| South Scotland | £13.9 |
| East Midlands | £13.5 |
| Southern | £11.8 |
| Eastern | £11.8 |
| North Western | £11.8 |