What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £38.00 |
| 2 | Carrington Ltd - 2 | £15.88 |
| 3 | GridBeyond L0DN | £15.50 |
| 4 | Ferrybridge-1 | £11.39 |
| 5 | Ferrybridge-2 | £11.39 |
| 6 | Roosecote | £10.00 |
| 7 | West Burton B 2 | £6.83 |
| Region | £/MWh |
|---|---|
| Yorkshire | £11.4 |
| North Western | £10.0 |
| South Scotland | £4.6 |
| Eastern | £3.2 |
| Merseyside and North Wales | £2.2 |