What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 41 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Ferrybridge-1 | £1441.04 |
| 2 | GridBeyond L0EN | £1429.53 |
| 3 | Dong Severn Ut 20 | £984.03 |
| 4 | Carrington Ltd - 2 | £505.64 |
| 5 | West Burton B | £485.50 |
| 6 | BGI Trading #02 | £382.25 |
| 7 | Port of Tyne | £370.15 |
| Region | £/MWh |
|---|---|
| Yorkshire | £1441.0 |
| East Midlands | £485.5 |
| Northern | £342.7 |
| Eastern | £326.8 |