What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 44 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Fasnakyle G3 | £20.30 |
| 2 | GridBeyond L0EN | £16.55 |
| 3 | Thame Road | £11.79 |
| 4 | Chapel Farm | £11.79 |
| 5 | Skelmersdale | £11.14 |
| 6 | Dong Severn Ut 20 | £10.88 |
| 7 | Contego | £9.80 |
| Region | £/MWh |
|---|---|
| North Western | £11.1 |
| South Eastern | £9.8 |
| Southern | £9.1 |
| East Midlands | £8.9 |
| Eastern | £8.3 |
| North Scotland | £7.4 |
| South Scotland | £6.8 |
| Northern | £6.5 |