What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 87 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | GridBeyond L0EN | £2993.38 |
| 2 | GridBeyond L0DN | £1310.06 |
| 3 | UKPR MANW | £1310.00 |
| 4 | Chapel Farm | £1238.92 |
| 5 | Carrington Ltd - 2 | £1225.88 |
| 6 | Native River | £993.17 |
| Region | £/MWh |
|---|---|
| Eastern | £1238.9 |
| South Western | £993.2 |